Automated Storage & Retrieval (AS/RS)

Automated Storage & Retrieval (AS/RS) Systems

Automated pallet handling for facilities where speed, accuracy, and density all matter. Machines . Your team focuses on value-added work.

Up to 100'

Full-height vertical storage

300+ Pallets/Hr

Automated cycle times

99.9% Accuracy

Automated inventory tracking

An automated storage and retrieval system (AS/RS) is a computer-controlled warehouse storage solution that automatically places and retrieves pallets or cases from high-density racking using cranes, shuttles, or robotic vehicles. AS/RS systems are used in facilities requiring high throughput, reduced labor, and maximized vertical storage.

The Right Application

When Manual Systems Are the Bottleneck

Throughput-Constrained Operations

When your order volume exceeds what a manual pick operation can handle in the available hours, and adding labor and space isn't , automated retrieval changes the equation. Machine cycle times aren't bound by travel distance or picker fatigue.

High-Value Inventory Security

Vertical lift modules and carousel systems store inventory inside enclosed units with controlled access, a significant security advantage for high-value, regulated, or controlled substance inventory that requires audit-traceable access records.

Vertical Cube Utilization

AS/RS systems store product to building height, using vertical space that standard rack and manual picking can't practically reach. In high-bay facilities, that cube represents a significant number of additional storage positions.

Automated Storage & Retrieval (AS/RS) product in warehouse setting

Technical Specifications

Key Specs & Configuration

System Height 40'–100'+
Aisle Width As narrow as 5' for crane-based systems
Throughput 20–60+ pallet moves per hour per aisle
System Types Unit-load cranes, pallet shuttles, robotic systems, VLMs, carousels
WMS Integration WMS connectivity, conveyor systems, dock door automation
Best For High-volume distribution, cold storage, 24/7 operations, labor-constrained facilities
Typical Timeline 12–24 months from concept to operation
Code Notes Tall structures require significant structural engineering; fire protection for high-bay automated storage is highly , requires early fire marshal coordination

Brands We Carry

Built With Industry-Leading Components

Interlake Mecalux

How It Works

General Contractor and Integration Partner: Not Just Rack

Automated storage and retrieval comes in : vertical lift modules (VLMs), horizontal and vertical carousels, and unit-load or mini-load cranes for pallet and tote storage. System selection depends on your throughput requirements, inventory unit size and weight, and the degree of WMS integration your operation supports.

We serve as general contractor and , coordinating between automation vendors, racking manufacturers, fire protection engineers, and building departments. Our role ensures the physical structure, permitting, and installation support your automation investment rather than creating delays or compliance gaps.

Tall AS/RS structures require significant structural engineering . Fire protection for high-bay automated storage is highly specialized. We manage all of this from day one, not after the equipment is ordered.

Automated Storage & Retrieval (AS/RS) system configuration diagram

What You Get

Built In, Not Bolted On

Machine-Driven Retrieval

Vertical and horizontal machine movement retrieves stored units without , consistent cycle times regardless of inventory depth.

WMS Integration

System integrates with your warehouse management system for location tracking, pick sequencing, and . Every transaction documented automatically.

Full Project Coordination

Equipment selection, structural engineering, electrical design, controls integration, and permitting handled by one team, not a multi-vendor hand-off.

Automated Storage & Retrieval (AS/RS) professional installation

Related Services

We Handle Design, Installation & Permitting

Hammerhead Warehouse Systems has been an incredible partner over the years. Their team is highly professional, knowledgeable, and reliable. They consistently deliver top-quality solutions tailored to any needs and go above and beyond to ensure projects are completed on time and meet the highest standards.

Miguel Suarez

Google Review

FAQ

Common Questions

When does AS/RS make financial sense?

AS/RS investments are typically justified by a combination of labor reduction, real estate efficiency, and throughput requirements that manual systems can't meet. Cold storage AS/RS often has the . Every square foot of conditioned space eliminated has a direct operating cost benefit. High-volume 24/7 operations where labor availability is constrained are the other primary justification. We can help you model the case before committing to the project.

How long does an AS/RS project take?

AS/RS projects typically run 12–24 months from concept through operational commissioning. The timeline includes design, equipment manufacturing, permitting (complex for tall structures), civil and structural work, equipment installation, and controls integration. Early coordination with your fire marshal and building department is critical. We initiate those conversations at the start of design, not after equipment is ordered.

Do you work with specific automation manufacturers?

We work with leading automation vendors and approach system selection based on your specific throughput requirements, product profile, and budget, not a single preferred manufacturer relationship. Our value is in coordinating the full project: physical structure, permitting, and installation support for whichever automation technology best fits your operation.

Exploring Automation for Your Warehouse?

Let us help you evaluate whether AS/RS fits your operation. From initial assessment through commissioning. Free consultation, no obligation.

Schedule a Site Visit