Learning Center

Warehouse Resources & Learning Center

Practical guides, expert articles, and project insights from 40+ years of designing, permitting, and installing warehouse storage systems. No theory, just what works in real facilities.

Stay Ahead of Compliance Changes

Get practical warehouse insights, code updates, and project tips delivered to your inbox. No fluff, just information that helps you run a safer, more efficient operation.

We respect your inbox. Unsubscribe anytime.

FAQ

Frequently Asked Questions

What is a high-pile storage permit and do I need one? +
A high-pile storage permit is required when stored materials exceed certain height thresholds, typically 12 feet for most commodities, though this varies by jurisdiction and commodity classification. If you're installing or modifying warehouse racking, your local fire authority will likely require one. We handle permitting as part of our project scope so you don't have to navigate this alone.
How do I know if my existing racking will pass inspection? +
Start with a visual assessment: check for damaged uprights, bent beams, missing safety clips, proper load placards, and adequate sprinkler clearances. Our pre-inspection checklist covers the full list. For a professional assessment, we offer safety inspection services that identify issues before an inspector does.
What's the difference between selective and drive-in racking? +
Selective racking provides direct access to every pallet position, ideal for diverse SKUs and high pick frequency. Drive-in maximizes density with last-in-first-out access, better for high-volume, low-SKU operations like cold storage. The right choice depends on your facility layout, product mix, and throughput requirements.
How long does a typical warehouse racking project take? +
A straightforward selective racking install might take 2–4 weeks from signed proposal to operational. Projects requiring engineering stamps, complex permitting, or phased installation around 24/7 operations typically run 6–12 weeks. We provide clear timelines during quoting and can often expedite permitting through established relationships with local authorities.
Do you handle permits, or is that the customer's responsibility? +
We handle it. We prepare required documentation, submit to your local jurisdiction, coordinate with fire marshals and inspectors, and stay through final sign-off. If anything gets flagged, we fix it. That's included, not extra.
Can you install racking without disrupting our operations? +
Yes, night and weekend installation, phased rollouts by zone, and coordination with your ops team. We work with your schedule, not the other way around.

Have a Warehouse Project Coming Up?

Whether you're planning a new installation, expanding an existing system, or need help with permitting and inspections, we start with a free site visit to understand your facility. No obligation, no pressure.

Call or Text (323) 797-5580 · info@hammerheadws.com