Selective Pallet Racking
Selective Pallet Racking Designed, Delivered, and Installed
100% direct access to every pallet position. We handle the full project from layout design through permitting and installation.
Get Your Free Quote
Tell us about your project and we'll respond within one business day with a layout concept and budget estimate.
100% Selectivity
Direct access to every pallet
3x Capacity
Compared to floor-level storage
2-5 Day Install
Most standard systems
How It Works
Three Steps to a Better Warehouse
Tell Us About Your Project
Share your building dimensions, storage goals, and timeline. We respond within one business day.
We Design a Layout
Custom CAD layout engineered for your space with a detailed quote. No obligation.
We Build and Install
Permitting, equipment, and installation handled by one team. You stay focused on your operations.
The Challenge
Storage Problems That Add Up Fast
Running Out of Floor Space
Product stacked on the floor or double-handled because there's nowhere to grow vertically. You're paying rent on square footage you can't use.
Slow Picks, Blocked Aisles
You can't reach the pallet you need without moving three others first. Every pick takes longer, errors go up, and your crew gets frustrated.
Permit and Code Questions
You need racking installed but aren't sure what permits apply or whether your floor slab can handle the load. Getting it wrong means delays, fines, or rework.
What You Get
Why Teams Choose Hammerhead
Engineered for Your Building
Layouts designed around your actual dimensions, ceiling height, column spacing, and forklift clearances. Not pulled from a catalog.
We Handle All the Permits
PE-stamped drawings, building permits, high-pile storage permits, all coordinated for your jurisdiction. You don't chase paperwork.
Vetted and Insured Crews
Installers with commercial warehouse experience who show up on time. Fully insured, background-checked, and scheduled around your operations.
One Team, One Invoice
Design, engineering, permitting, and installation managed by a single project team. If something doesn't line up, it's on us.
They were quick to respond and very helpful throughout the design process. The final warehouse racking layout we chose maximized the total pallet storage for our business's warehouse.
Daniel Martin
Google Review
FAQ
Common Questions
How long does a selective pallet rack project take?
Design usually takes 1 to 2 weeks depending on building complexity. Installation of a standard selective layout runs 2 to 5 business days. We run permitting in parallel so it does not add time on the back end.
Do we need permits and PE-stamped drawings?
For most commercial installations, yes. Building permits and high-pile storage permits apply in most jurisdictions, and PE-stamped drawings are typically required on permitted projects. We handle both as part of the project scope so you are not coordinating with the city directly.
Can you install while we stay operational?
Yes. We phase the work so receiving and shipping keep moving. Our install teams schedule around your shift patterns and work in sections, so you are not shutting down the warehouse to make room for the project.
What size projects do you typically take on?
Most selective rack projects we handle run from a few hundred pallet positions up to tens of thousands, across distribution centers, manufacturing plants, and new facility buildouts. If your project is a few bays in a stockroom, we are probably not the right fit. If you are outfitting a commercial warehouse, we are.
Will your installers meet our insurance and safety requirements?
Our crews are vetted and fully insured. We provide COIs ahead of the install with whatever additional-insured wording your facility needs, and we follow your site-specific PPE, badging, and safety protocols on the job.


