Warehouse Distribution
GSA Selective Rack Replacement For US Air Force
Location
San Diego, CA
Size
Small
Timeline
2 Days
Client
US Air Force (GSA)
4 photos · Click any photo to enlarge
The Project
Tear-down and full replacement of selective pallet racking for a US Air Force facility, upgrading capacity and bringing the system into seismic code compliance. Nucor racking installed with ProDeck and wire decking throughout.
The Challenge
The existing racking system lacked the capacity the facility needed and did not meet current seismic force protection requirements. The entire system had to be torn down and replaced with code-compliant racking, all while coordinating within GSA procurement and base access protocols.
The Outcome
Hammerhead removed the outdated racking and installed a new Nucor selective pallet rack system engineered to seismic compliance standards. ProDeck and wire decking were used across the installation, increasing storage capacity while meeting all applicable building codes for the region.
Project Details
- Industry
- Warehouse Distribution
- Location
- San Diego, CA
- Facility Size
- Small
- Timeline
- 2 Days
- Client
- US Air Force (GSA)
Systems Used
Have a Similar Project in Mind?
We scope each project around your facility, your product mix, and your operation. Start with a free consultation.
Call or Text (323) 628-8190 · info@hammerheadws.com
